Analysis Of Human Resources Based on the Workload Of Production Employees at CV. Pagupon Apparel Using the Nasa-Tlx Method

Authors

  • Yuniar Prakoso Universitas Duta Bangsa

DOI:

https://doi.org/10.61536/escalate.v4i4.744

Keywords:

Mental Workload, NASA-TLX, Production Workers, Apparel Industry

Abstract

This study aims to assess the mental workload of production employees at CV Pagupon Apparel, identify the dimension with the largest contribution to the total workload, and formulate recommendations for work system improvement. A descriptive quantitative approach with a cross-sectional design was employed, involving all 35 production employees through saturated sampling across six departments: Layouting, Printing, Cutting, Sewing, Pressing, and Finishing. Data were collected through observation and the NASA Task Load Index (NASA-TLX) questionnaire and analyzed by calculating the Weighted Workload (WWL) scores. The results showed an average WWL score of 73.60, indicating a high level of mental workload. Of the 35 employees, 32 (91.43%) were classified as having high workload, while 3 (8.57%) were in the very high category. Among the departments, Printing recorded the highest average WWL score (77.75), followed by Pressing (77.25). Temporal Demand was the dimension with the largest contribution to the total workload, accounting for 19.80%, followed by Mental Demand (18.43%) and Frustration (17.19%). Based on these findings, the study recommends improving production scheduling, standardizing visual work instructions, and implementing proportional employee rotation and break scheduling to support workload management.

Downloads

Download data is not yet available.

References

Adikarana, N. A., Herwanto, D., & Rifa’i, M. R. (2022). Analisis beban kerja mental menggunakan NASA-TLX pada divisi produksi perusahaan metal stamping. Go-Integratif: Jurnal Teknik Sistem Dan Industri, 3(2), 98–109. https://doi.org/10.35261/gijtsi.v3i02.7151

Ambri, S., Ihsan, T., & Lestari, R. A. (2022). Kajian pengaruh faktor pekerjaan dan faktor pekerja terhadap kelelahan kerja pada perawat rumah sakit di Indonesia. Media Kesehatan Masyarakat Indonesia, 21(1), 63–68. https://doi.org/10.14710/mkmi.21.1.63-68

Anwardi, Nofirza, Vilhelmina, V., Anggraini, W., & Silvia. (2021). Perancangan alat bantu perakitan spring bed yang ergonomi berdasarkan analisa RULA dan REBA. Jurnal Ergonomi Indonesia, 7(1), 73–85. https://doi.org/10.24843/JEI.2021.v07.i01.p10

Arifin, A. L. (2021). Urgensi perencanaan SDM sebagai upaya penyelarasan strategi bisnis perusahaan: Kajian literatur. Jurnal Ekonomi Manajemen, 7(2), 149–160. https://doi.org/10.37058/jem.v7i2.3028

Ayuningtyas, W., Herwanto, D., & Putra, C. G. G. (2021). Work fatigue analysis in machining and fabrication department with NASA-TLX and Subjective Self Rating Test. Jurnal Ergonomi Indonesia, 7(2), 135–142. https://doi.org/10.24843/JEI.2021.v07.i02.p06

Azhari, T. R., & Suparno, A. (2024). Analisis beban kerja mental di divisi OPJ pada perusahaan jasa telekomunikasi dengan NASA-TLX. Jurnal PASTI, 18(3), 329–343. https://doi.org/10.22441/pasti.2024.v18i3.004

Downloads

Published

2026-10-15

How to Cite

Prakoso, Y. (2026). Analysis Of Human Resources Based on the Workload Of Production Employees at CV. Pagupon Apparel Using the Nasa-Tlx Method. Escalate : Economics and Business Journal, 4(4), 254–258. https://doi.org/10.61536/escalate.v4i4.744

Similar Articles

1 2 3 4 5 6 7 8 > >> 

You may also start an advanced similarity search for this article.